Timeline is 52m, resulting footage from Worx is 17h

More
4 years 2 months ago - 4 years 2 months ago #7513 by James Carrick
James Carrick replied the topic: Timeline is 52m, resulting footage from Worx is 17h
Dear Stoovie,

Worx4x cannot trim everything that FCP X can create in a project. If you could forward the text sidecar file that gets created with Worx4x as that will detail the clips in question, otherwise looking at the XML it looks like you have compound and multicam clips in the XML, as such Compound or MultiCam clips are copied in their entirety, media file which are longer than these clips will be trimmed to the length of the original Compound or MultiCam clip. However, breaking apart Compound clips will allow the media to be trimmed to that used in the timeline.

I suspect you also have sync clips that contain a video clip and one or more audio clips, which entirely cover the used portion in the timeline will be trimmed, Sync clips that do not meet these criteria will be copied in their entirety. Breaking apart such Sync clips will allow the media to be trimmed.

Yours Sincerely

James
Last Edit: 4 years 2 months ago by James Carrick.

Please Log in to join the conversation.

  • stooovie
  • stooovie's Avatar Topic Author
  • Offline
  • Fresh Boarder
  • Fresh Boarder
More
4 years 2 months ago - 4 years 2 months ago #7509 by stooovie
stooovie created the topic: Timeline is 52m, resulting footage from Worx is 17h
Hi, why does my timeline of 52m, with 3s handles result in 15.5 HOURS of material?

File Attachment:

File Name: Strih.fcpxml.zip
File Size:264 KB


Thanks!
Attachments:
Last Edit: 4 years 2 months ago by stooovie.

Please Log in to join the conversation.

Time to create page: 0.216 seconds
Powered by Kunena Forum